SAPTEQ GLOBALCONSULTING SERVICES

Training, Development, Consultancy
SAPTEQ Global Consulting Services
4th Cross, Devasandra,
Bangalore, Karantaka 560036
India
ph: 91-9743503036,
alt: 91-9535160010
info

SAP MM Online Training
Introduction to ERP
• ERP Packages
• Introduction to SAP
• Functions and Objectives of MM
• SAP Real Time Project Team Structure & Business Process
• SAP R/3 Architecture
SAP Navigation
Org structure of an Enterprise in SAP R/3 System
• Company, Company code, Controlling Area, Plant, Storage Location, Purchase Organization, Purchasing group
Master Data
• Material Master
• Vendor Master
• Purchase Info Record
Source Determination
• Source List
• Quota Arrangement
Purchasing
• Purchase Requisition
• Purchase Order P.O. wref to PR, RFQ, Contract & Account Assignment Category
• Request For Quotation (RFQ)
• Outline Agreement
• Contracts
• Schedule Agreement
• PR, RFQ, CONTRACT AND
• ACCOUNT ASSIGNMENT CATEGORY
Document Types for Purchasing Documents
• Define Document Type
• Define Number Ranges for Document Types
• Define Screen Layout At Document Level
Release Procedure for Purchasing Documents
• Purchase Requisition, Purchase Order, Request For Quotation (RFQ), Outline Agreement- Contracts, Schedule Agreement
Pricing Procedure
• Maintain Condition Tables
• Define Access Sequence
• Define Condition Types
• Define Calculation Schema
• Define Schema Group
Schema Group Vendor
Schema Group for Porg
Assignment of Schema Group to Porg
• Define Schema Determination
Determine Calculation Schema for Standard Purchase Orders
External Service Management
• Service Master Creation
• Service PO
• Service Entry Sheet
Optimized Purchasing
• Automatic PO w ref to PR
• Automatic PO at GR
Inventory Management
• Movement Types
• Goods Receipt Scenarios
Creation of GR
Cancel GR
Return delivery to vendor
GR for Partial Delivery
GR for Stock Types
• Reservation
Creation of Reservation
Creation of GI wref to Reservation
• Goods Issue
• Transfer Postings
From Plant to Plant – One Step And Two Step Process
From Sloc to Sloc – One Step And Two Step Process
From Stock to Stock Blocked to Quality, Blocked to Unrestricted use Stock, Quality to Unrestricted use Stock
Physical Inventory
• Types of Physical Inventory
• Creating Physical Inventory Document
• Entering Physical Inventory Count
• List Of Inventory Differences
• Post the Difference
Special Stocks and Special Procurement Types
• Consignment
• Stock transport order
• Subcontracting
• Pipeline
• Returnable transport packaging – RTP
• Third Party Processing
Valuation and Account Determination
Introduction to Material Valuation Price Control
• Moving Price
• Standard Price
• Split Valuation
• Configure Split Valuation
• Defining Global Categories
• Defining Global Type
• Defining Local Definition& Assignment
Invoice Verification
• Basic Invoice Verification Procedure
• Invoice for Purchase Order
• Unplanned Delivery Costs
• Planned Delivery Costs
• Credit Memo
• Blocking the Invoice
• Releasing Blocked Invoices
• Subsequent Debit/Credit
• Automatic Settlements (ERS)
• ERS Configuration Settings
• GR/IR Account Maintenance
Integration Concepts
Integration of MM with FI/CO Automatic Account Determination
Integration of MM with SD
• Stock Transport Order (STO)
• Intra Company Stock Transfer
• Inter Company or Cross Company Stock Transfer
Integration of MM with PP
• MRP Concepts
• Planned Independent Requirements
• Consumption Based Planning
• Re Order Point Planning
• Automatic and Manual ROP
• Forecast Based Planning
Copyright 2010 SAPTEQ Global Consulting Services. All rights reserved.
Please Note: SAP is a registered trademark of SAP AG. SAPTEQ is not affiliated or related to any division or subsidiary of SAP AG.
SAPTEQ Global Consulting Services
4th Cross, Devasandra,
Bangalore, Karantaka 560036
India
ph: 91-9743503036,
alt: 91-9535160010
info