SAPTEQ GLOBALCONSULTING SERVICES

Training, Development, Consultancy
SAPTEQ Global Consulting Services
4th Cross, Devasandra,
Bangalore, Karantaka 560036
India
ph: 91-9743503036,
alt: 91-9535160010
info

SAP PP Online Training
SAP Production Planning Course Content:
• Overview of ERP
• About SAP
• SAP Hierarchy Structure
Master Data
• Material Master
• Bill of Material – BOM
• Work Center
• Routing – Different types of Routing
• Production Version
Sales and Operational Planning – SOP
• Standard Planning (with standard so76 info structure)
• Planning with the Product Groups
• Planning with the Materials
• Product Group Aggregation and Desegregation
• Creation of Plan and version management
• Transfer of Plan to Demand Management
Master Planning
• Demand Planning
• Creation of PIR (Planned independent requirements)
• Planning Strategies
Planning Material Requirement
• Master Data requirements in MRP
• Carrying MRP Procedure MRP, MPS, CBP
• Difference between MRP Vs MPS
• Control indicators Processing like NETCH,
NETPL, NEUPL
• Evaluation of planning results and planning table
• Master Production Scheduling planning run (MPS RUN)
• MRP Run In Background for all network Plants
• Processing Planned orders
• Planned orders conversion
• Production Orders from planned orders
• Production order creation
• Production order confirmation
Goods Movement in PP
• Goods Receipt wref to Production Order
• Goods Issue wref to Production Order
• Creation of GI wref to Reservation
• Restricting Goods Receipt Unless Production
Order is Confirmed
Batch Management
• Condition Tables
• Access Sequence
• Strategy Types
• PP Batch Search Procedure
• Batch Status in PP
• Characteristics and class
• SLED In Batch in PP
• Manual And Automatic Batch Display In PP
• Production orders creation using Batch
Variant Configuration in PP
Variant Configuration in BOM
• Characteristics
• Class
• Classification
• Classification settings in material master
• Maintain Dependency
• Configurable Profile for Material
Availability Check
Availability Check with ATP Logic or Against Planning
Repetitive and Discrete Manufacturing Process
• Master Data Maintenance
• Production versions
• REM Profile
• Backflusing
• REM Back flushing
INTEGRATION OF PP WITH OTHER MODULES
• MM
• SD
• QM
• WM
• FI
Production Planning is called as Manufacturing Module, PP has a very good openings and there is a lack of trained professionals in the market, Who ever does the domain experts or qualified people who did in SAP PP will get the career line easily in the market. PP will be taught by highly experienced industry professionals where you can succeed with in minimal period
Copyright 2010 SAPTEQ Global Consulting Services. All rights reserved.
Please Note: SAP is a registered trademark of SAP AG. SAPTEQ is not affiliated or related to any division or subsidiary of SAP AG.
SAPTEQ Global Consulting Services
4th Cross, Devasandra,
Bangalore, Karantaka 560036
India
ph: 91-9743503036,
alt: 91-9535160010
info